AVGS Activity Models
Requirement Decomposition Portal

Requirement Review Checklist

Run this before importing requirements into JAMA.

Requirement Review Checklist

Requirement quality

  • Single-purpose, testable statement
  • Adds value beyond the parent requirement
  • No vague language ("essential", "appropriate", "as needed")

Scope correctness

  • Stays within Ground Systems scope
  • Does not claim analytics or maintenance decision ownership

Ownership accuracy

  • Does not imply ownership of Air Vehicle systems
  • References FDR/CJP only as interfaces, not owned items

Interface accuracy

  • Interfaces named correctly (e.g., Common Junction Panel)
  • Direction of data flow is clear

Rationale completeness

  • Explains why the requirement exists
  • References applicable standards, AFIs, or program docs
  • Captures SME-confirmed assumptions

Parent-child traceability

  • Traces to the correct parent in the RV package
  • Outdated parent links broken and reconnected

SME validation

  • Mission reliability claims confirmed with Reliability Engineering
  • Configuration preservation language confirmed with CM / Air Vehicle SME
  • PSE / O-Level language confirmed with Product Support

Spelling and terminology

  • Spell check completed
  • Acronyms expanded on first use
  • Consistent terminology with parent and sibling requirements
Ready for JAMA Review

All items above checked, SME validation complete, rationale finalized.