AVGS Activity Models
Mission Systems · Ground Support
Perform · Walkthrough
41 / 43
Perform, step by step
The job of this gate: turn raw staged data into validated findings across every analytical discipline, then bundle one coherent results package.
1
Retrieve & validate
Pull the staged package and confirm schema and completeness. Invalid data is quarantined and a discrepancy is raised — analysis never runs on broken inputs.
2
Resolve configuration baseline
Look up this tail's exact configuration (engines, software loads, mod status) so every analysis compares against the right reference.
3
Parse parameters & time series
Decode the recorded signals into structured time series ready for math.
4
Fork — five parallel analyses
MFOQA scores flight events; CBM+ trends health and estimates remaining useful life; Integrity updates fatigue and inspection intervals; Maintenance correlates faults to work orders and procedures; ILS verifies spares, tools, and trained personnel.
5
Join & correlate across domains
Findings are consolidated so cross-domain patterns surface — e.g. a hard landing tied to a vibration trend tied to fatigue consumption tied to a needed inspection.
6
Generate reports & package for upload
Reports, alerts, and recommendations are produced; fleet readiness indicators are updated; the whole result is bundled for the Upload gate.
Principle: validate first, analyze in parallel, then correlate into one packaged result.
AVGS · Air Vehicle Ground SupportReceive · Perform · Upload
41 / 43